The Stonehaven Flood Protection Scheme (FPS) is designed to protect homes and businesses which have previously been badly affected by flooding events around the River Carron. In the recent years of 2009 and 2012, and several times prior to that, there have been a number of big flood events in the area. The scheme is intended to provide a standard of protection well above the current Association of British Insurers requirements, reducing flood risk to 372 residential properties, two public utility sites, a school, a nursing home and an emergency service site. Once completed, it will provide a 0.5% chance of occurrence standard of protection (1 in 200-year flood event). It will also include an allowance for climate change (33% increase to 2080) and a safety margin catering for uncertainties.

Delivered by McLaughlin & Harvey, the works are the design of defined elements and construction of the Stonehaven Flood Protection Scheme. The works include removing, replacing and raising the Red Bridge and Green Bridge, whilst also repositioning the Green Bridge. Similarly, the White Bridge has required removing, refurbishing and reinstating in a raised position, and the Bridgefield Bridge parapet has been replaced with a reinforced glass type material. The Beach Bridge has been raised and widened, and floodwalls will be constructed between the Red Bridge and the river mouth. The island downstream of the Green Bridge was removed, two higher capacity culverts have been installed on the Glaslaw Burn and another new culvert is due to be fitted under the gardens of Cameron Street. Finally, a new pedestrian walkway has been constructed from Bridgefield Bridge to the Beach Bridge.

Timeline of events:

  • September 2014 – The council committee agrees funding/application sent to the Scottish Government for funding
  • May 2015 – Public consultation event
  • June 2015 – Flood Risk Management Act (2009) application
  • March 2017 – Public hearing
  • June 2017 – The committee confirms the proposed Stonehaven Flood Protection Scheme with modifications
  • September 2017 – Scheme becomes operational
  • November 2018 – A contractor appointed following the tender process
  • February 2019 – Ecological works, such as tree surgery, begin
  • March 2019 – Construction works start
  • Summer 2021 – Completion of construction works in Zones 4A, 1C, 1D, 1E, 2G
  • 2023 – Completion of construction works in Zone 1B including building a 2.4m high culvert under the gardens of residents, a section of the hydraulic wall and the reinstallation of a listed bridge.

With the upstream work completed, the scheme has hailed a large amount of positive feedback, with the majority of the locals particularly supportive of the works given how affected they have been by the previous floods. The walls themselves that have been installed throughout this scheme are clad in stone, granite and sandstone, which aesthetically fits into the landscape of the conservation area that it is located in, softening the hard engineering aspects of the scheme.

Aberdeenshire Council’s Principal Engineer for Major Projects, Rachel Kennedy, said: “Prior to the scheme being installed, we have had to evacuate local residents from their homes during flood events. The fact that this will no longer have to happen is extremely significant. People were unable to insure their homes against floods – this will all change now. From a local authority perspective, it is a crucial investment, and it has delivered what we intended it to.”