Premier Construction

Brookview Court

Brookview Court
Written by Roma Publications

Brookview Court

Co-operative Housing Ireland, in partnership with Kingdom Installation Ltd., was recently awarded the ‘Retrofit Project of the Year’ award at the 2022 Irish Building and Design Awards.
Co-operative Housing Ireland (CHI), an Approved Housing Body providing 4,000 high quality homes to low-income households, employed the skills and expertise of Kingdom Installations in 2021 to perform crucial deep energy upgrades to 58 homes in Brookview Court, Tallaght.

The project ensured the longevity of the housing stock and the warmth and wellbeing of families living there. Unlike other large scale retrofit projects, in which home occupiers need to be decanted and temporarily rehomed, CHI Members lived in situ while works took place. An uplift to BER A3 rating was achieved for most homes from an original BER of C2/C3 resulting in an average uplift of 120 kWh/m2/y per property.

David McCourt, CHI’s Head of Assets Management and Property Services explains the need for the retrofit work. He said: “Brookview was built in 2001 at the foot of the Dublin mountains, which leaves it exposed to the harsh weather. As a result, the original timber doors and windows had degraded significantly. Poor insulation and degeneration of window and door components led to low air tightness and poor heat retention, which increased the risk of mould and mildew. The homes relied on gas boilers and open fires for heat. Each home had varying levels of wear and tear to windows, doors, heating systems and general fabric of the building.”

Ciarán Carmody, Kingdom Installation’s Contracts Manager describes the products, materials and processes used for the project. He said: “Premium quality products, innovative materials and technologies were selected to ensure the highest result was yielded in each case. Premiere works carried out included insulating attics with 300 mm top-grade Knauf Earthwool® Loft roll 44 insulation which is known for its thermal conductivity and ability to aid heat retention.  The insulation is made with a formaldehyde-free binder, and renewable bio-based materials instead of petroleum-based chemicals making it environmentally friendly and has zero Ozone Depletion Global Warming potential.

Many of the homes also received improved attic ventilation and wall cavities were filled with Energystore Cavity Wall Insulation, an expanded polystyrene material which is injected in bead form with a binding agent into cavity walls. This reduced the U-value of external masonry cavity walls to 0.03 W/m²k. The original windows were replaced with triple-glazed windows 1.1 W/m²k. “Palladio” premium Composite Doors providing security and high insulation values of 0.9 W/m²k were fitted, and back doors were replaced with double-glazed uPVC doors with a 1.4 W/m²k and air leakage factor (L factor) 0.03 W/m²k. Gas boilers were replaced with Mitsubishi Ecodan air-to-water heat pumps in every home, which records operating data and errors from the last 30 days via the SD card which can be read by a specialist. The heat pump is also connected to WiFi and can be controlled via the MEL Cloud ™ App allowing residents to turn heating on/off, control temperatures in different zones, and boost hot water. Furthermore, homes received high output low temperature radiators and power shower and fireplaces and chimneys were blocked up.

Brookview had been scheduled for an extensive component replacement programme which traditionally would have seen the like for like lifecycle replacement of components like windows, doors and boilers on each property.  By incorporating these lifecycle replacements into a deep energy retrofit project, CHI ensured that the properties’ energy performance was greatly improved and futureproofed. Members now benefit from warmer, more comfortable houses with visual improvement to the look and feel of the property.  Future maintenance works will be consolidated by the unification of energy provision, hot water and heating under one system.

A comprehensive service was provided to CHI Members from installations to information packages and live demonstrations. Workshops on the new technologies were held during and after. Members were given individual induction(s) on how to use the heat-pump and other new technologies installed. CHI is delighted with positive impact on Members’ morale in the area.

Resident, Aisling Brannigan described the difference made by the energy upgrades for her family. She said: “The heat is great now, especially with the new windows and doors. With the windows and doors before, there were obviously more draughts than we realised and now, I can’t keep the heating on all day- it almost gets too warm! You can really feel the difference in the house.”
This retrofit programme was the first large-scale retrofit project of its kind undertaken by CHI and has paved the way for work to come. It acted as a pilot project for CHI’s larger ‘Improving Warmth and Wellbeing’ programme which will see circa 200 homes retrofitted in partnership with Kingdom Installation Ltd. These types of retrofits will become part and parcel of how CHI futureproofs its stock for generations to come and is paramount to the comfort of CHI’s Members from an environmental and economic perspective.

Brookview Court

 

About the author

Roma Publications