Current Magazine • Digital Archive • Featured • Premier Construction • Premier Construction Magazine

Premier Construction 35.9

Premier Construction 35.9
Written by Roma Publications

This Month in Premier Construction 35.9


Welcome to the latest edition of Premier Construction!

In this month’s issue we check out Weston Airport Terminal; we take a look at The Shackleton Experience; and we unveil the Student Hub at Queen’s Business School.

Recognised for the project’s dramatic expansion and thoughtfully upgraded facility, Weston Airport Terminal, located in Dublin, was awarded Building Refurbishment of a Single Building or Development of the Year at the Irish Building and Architecture Awards 2026. Weston Airport is Ireland’s only dedicated executive airport and the leading general aviation airport in Ireland, which is also home to Ireland’s leading pilot training academy, National Flight Centre. After being acquired by new owners, Weston Airport undertook an extensive project to refurbish its pre-existing terminal building.

Since re-opening, The Shackleton Experience in Athy, Co. Kildare has been recognised for its incredible transformation; winning Leisure, Tourism and Hospitality Project of the Year at the Irish Building and Design Awards 2026 and awarded winner in the Public Building category at the 2026 ICE Awards. Previously the 300-year-old building was an early Georgian market town hall and courthouse that became the Arthy Heritage Centre, home to the Shackleton Museum. However, Kildare County Council found that the centre didn’t maximise the potential of the Shackleton exhibition content, building or its location.

Queen’s University in South Belfast opened their brand new £17.5m Student Hub, located within their wider Business School’s Riddel Hall Campus in 2023. Developed in collaboration with the Business School and the project’s lead architects, Todd Architects the scheme introduced a state-of-the-art facility that has both, responded to the changing educational needs of its rapidly growing post-graduate community and become a transitional link between education and employment. The new hub sits within a sensitive landscape, opposite the Grade II listed Riddel Hall and the surrounding mature woodland. The scheme responded to this by ensuring the building’s height sat below the existing tree canopy as well as having fragmented edges that has minimised the removal of trees.

With all this and more, join us as we explore the impressive construction projects that continue to shape our landscape.

About the author

Roma Publications