Modular construction specialist Darwin Group has delivered a new emergency COVID-19 ward – scaling 1394 sq. m – for the Royal Free London NHS Foundation Trust.
The global pandemic has heightened the demand for additional medical facilities in the UK and the Trust appointed a firm it knew could deliver at pace.
The Shropshire-based firm’s modern methods of construction and unique turnkey service, allowed for a quick turnaround on the project, which was completed inside just six months.
The brand-new £6.57m emergency ward provides 35 additional hospital beds and is
fully Health Technical Memoranda (HTM) compliant – meaning the design, installation, and engineering behind the facility are in-line with best-in-class healthcare standards.
Darwin Group’s delivery of this build has redefined what is achievable against tight deadlines and within budget. Its end-to-end turnkey services, covering all stages of design, planning, engineering and construction from start to finish, also enabled construction to continue during lockdown at the height of the COVID-19 pandemic.
Modern methods of construction allowed for Darwin Group to complete much of the build off-site, at its highly-controlled factory environment, where minimising waste and quality control are also a key focus.
Installation amongst a complex live hospital environment also called on Darwin Group’s industry experience, allowing for the build to be completed with minimal disruption.
The build was referenced in the BBC documentary series, Hospital, which showcased the heroic efforts of staff at Barnet Hospital.
Charles Pierce, Managing Director at Darwin Group, said: “This is our third permanent hospital ward that we have delivered during the coronavirus outbreak, following on from schemes in at the Royal Albert Infirmary in Wigan and New Cross Hospital in Wolverhampton.
“Our skilled in-house team of designers, planners and architects have considered the specific needs of each hospital along the way and how to match these with the surrounding environment – and our delivery at Barnet Hospital is a best-in-class example of that.
“We are proud British company delighted to be supporting the NHS in the fight against COVID-19. We are acutely aware of the significance of this emergency facility, and how pivotal it could prove for the patients, doctors and nurses it will benefit.”
Darwin Group is committed to the quality and longevity of its builds and offers financial payment plans and assists with funding applications to ensure client aspirations and budget constraints align.
For more information, visit: www.darwingroupltd.co.uk
