- Shift to a hybrid approach taken by 51 per cent of professionals
- Healthcare/Pharmaceuticals, Construction and Manufacturing are the sectors which have seen the biggest changes in project approach.
- 85 per cent of project professionals who have adapted to a new approach anticipate using it for similar projects in the future
- Findings demonstrate the project profession’s ability to ‘adapt and pivot to change quickly in times of uncertainty’
Over half (52 per cent) of project professionals say the methodology they use for their main project has changed since the start of the first UK lockdown in March 2020, with 51 per cent of those who have changed adopting a more hybrid approach.
Association for Project Management (APM), the chartered body for the project profession, undertook the survey, which reveals the different approaches that project managers have embraced since lockdown, as well as the main benefits achieved.
Of the 52 per of project professionals who have changed methodology on their main project since March 2020:
- 51 per cent have shifted to a more hybrid approach – a pragmatic approach that combines a linear (or ‘waterfall’) life cycle for some phases with an iterative (or ‘agile’) life cycle for others) *
- 28 per cent have shifted to a more agile approach (a methodology where requirements and solutions are developed iteratively and incrementally throughout the project life cycle)
- 20 per cent have shifted to a more linear/waterfall approach (a life cycle where phases of the project are sequential)
The main benefits achieved by changing the approach include greater flexibility and adaptability, better understanding of what is being delivered and being easier to identify and resolve issues on the project.
APM’s survey, carried out by research company Censuswide, also reveals the industry sectors which have seen the highest number of project managers changing approach to their main project, with healthcare/pharmaceutical, manufacturing and construction seeing the largest shift.
The survey also reveals that the overall majority (85 per cent) of respondents say they anticipate using this new approach on similar projects in the future, proving how valuable it can be to project teams to pivot to new approaches when circumstances change.
Mark Hepworth, acting CEO at APM says: “The last 18 months have caused much disruption and uncertainly and so it is important that project managers are able to quickly adopt new methods when required to, for the successful delivery of projects.
“As our survey shows, many project managers have changed their approach during lockdown, with many choosing to take a more hybrid method for the benefit of their project, while agile has also been adopted by those recognising the need to adapt to change quickly.”
In the healthcare/pharmaceuticals sector, 64 per cent of those managing projects have changed their approach to project management since lockdown.
Of those that have changed approach:
- 39 per cent in this sector have shifted to agile
- 37 per cent to taking a hybrid approach
- 25 per cent to using waterfall/linear
In the manufacturing sector, 63 per cent of project professionals say they have changed approach on their main project.
Of those that have changed approach:
- 53 per cent have move to hybrid
- 26 per cent have shifted to agile
- 21 per cent have shifted to waterfall/linear
In construction, 51 per cent of project professionals say they have changed their approach. Of those that have changed approach:
- 50 per cent have shifted to hybrid
- 26 per cent have moved to waterfall/linear
- 24 per cent have shifted to agile
The main benefits achieved for changing to agile, waterfall and hybrid are also revealed by project professionals responding to the survey:
For those who have shifted to a hybrid approach, the main benefits are:
- Greater flexibility/adaptability (34 per cent)
- Better understanding of what is being delivered (20 per cent)
- Easier to identify and resolve issues (17 per cent)
For an agile approach, the main benefits are:
- Greater flexibility/adaptability (28 per cent)
- Easier to identify and resolve issues (21 per cent)
- Quicker progress made on the project (21 per cent)
For a waterfall/linear approach the main benefits are:
- Easier to identify and resolve issues (34 per cent)
- Quicker progress made on the project (23 per cent)
- A better understanding of what is being delivered (19 per cent)
* Taken from APM Body of Knowledge 7th edition