DBR (Southern) Ltd. applies extensive conservation expertise to save a Grade II listed landmark, ensuring its survival for future generations.
Often referred to as “Brighton’s Cathedral,” St. Peter’s Church is an iconic Grade II listed ecclesiastical landmark and a keystone of this proud, seaside city. Built as a result of a competition in 1824 to install a new chapel in the Steine district of the city, in 1873 St Peter’s became Brighton’s Parish Church.
After suffering from years of decay, this architectural gem required a comprehensive programme of conservation to secure its future. DBR, as a leading specialist in historic building conservation, with a Royal Warrant recently awarded from the King, has been acting as Principal Contractor on this restoration; directing and undertaking this complex, multi-phased project.
A critical mission
The initial imperative was to halt the serious decline of the church’s historic fabric. The building was in an extremely dilapidated condition, with significant stone erosion and corroding iron cramps exacerbated by the coastal environment, along with leaking roof coverings that required urgent structural repairs.
Beyond the physical restoration, the project aimed to revitalise a much-loved community space, ensuring St. Peter’s could continue to thrive as a safe and welcoming hub for local life in Brighton, maintaining its presence and significance for the community.
Enjoying this article? Sign up for our FREE newsletter!
Where craftsmanship and conservation meet
DBR managed this complex project, drawing on its full range of in-house, specialist craftspeople; including stone cleaners, stonemasons and metal roofers. The work was carefully phased over a period of 15 years, to align with separate tranches of Lottery funding. The scope of work was broad, addressing every aspect of the building’s exterior.
The first and most pressing tasks were to repair the roofing and carry out critical structural repairs. The aisle and mid-tier tower roofs were replaced with zinc pressed metal, incorporating new insulation and access hatches. Inside, the Nave’s roof structure was significantly strengthened with specially-designed steel plates needed to sustain vital structural loads.
Next, the Portland Stone façade required comprehensive masonry conservation. Cement-based mortar was carefully removed, due to its damaging properties, and the entire structure was repointed using traditional lime mortar. DBR’s skilled masons addressed numerous fractures, cleaned away decades of soot and stone scale, and performed highly skilled on-site templating and carving to replace intricate gothic revival stonework.
Ensuring heritage progresses into the future
The restoration of St. Peter’s Church has successfully preserved one of Brighton’s most important buildings. The meticulous conservation work has arrested the decay of the historic fabric, ensuring the structural integrity and architectural beauty of the church are saved for the future.
With the scaffolding now removed, the magnificent façade of St. Peter’s has been returned to the city, showcasing the incredible skill and dedication of the DBR Southern team. The project has not only preserved a cherished building but has reinvigorated a vital community asset, cementing its place at the heart of Brighton’s vibrant community.
“After 15 years of working on St. Peter’s Church, it is fantastic to see the scaffold finally coming down. It reveals the incredible hard work and skill of the DBR Southern team and gives this wonderful façade back to my hometown of Brighton. We are honoured to have played our part in securing the future of this remarkable building.” Adrian Attwood ACR, Executive Director and Chairman, DBR.
