Hanwell Station Redevelopment
After being taken over by Transport for London (TFL) in 2017, Hanwell Station has been entirely upgraded to meet the modern standards and requirements of rail travel, whilst also managing to retain the building’s established character. Working with the Railway Heritage Trust on this historic Grade II building, this renovation has been completed in conjunction with the wide programme of improvements across the rail network in preparation for the Elizabeth Line, which is set to bring an extra £1.5 million people to within 45 minutes of central London.
Despite the buildings that stand today being from a station rebuild in 1877, it was originally opened in 1838 by Great Western Railway, and now the station has been restored to the traditional Great Western Railway cream and golden-brown colour scheme, in order to allow the Victorian character to shine through. The work was undertaken by J Murphy & Sons and Elm Site Services and has helped remove Hanwell Station from the ‘Heritage at Risk’ register by Historic England.
The work on this station was awarded the Ealing Civic Society’s 2021 Annual Award for the sensitivity of the restoration of the Grade II listed building, ahead of the start of the Elizabeth line services this year. Since 1989, the Ealing Civic Society have given awards to recognise and encourage building and environmental projects that succeed in making a notable contribution to Ealing, and this year they were unanimous in choosing Hanwell Station as their winners.
“Ealing Civic Society is delighted to present this award to TfL for the restoration of Hanwell Station. This unusual project shows that it is possible to combine sympathetic restoration of a heritage asset with modern convenience. That this is a publicly accessible location is also welcome, allowing the restoration to be appreciated by travellers every time they pass through,” said Ann Chapman, Chairman of the Ealing Civic Society.
“Hanwell station clearly demonstrates how successful infrastructure can be delivered through collaboration with the client, contractor, design team, and local community. The judges were mindful of the constraints that the project had to be delivered within, notably being constructed whilst keeping the station operational. All the judges commended the considered restoration of the existing station buildings, platforms, and waiting rooms creating a station of rich visual character and heritage that will aim to serve it’s community for generations to come,” said Harbinder Birdi, Infrastructure Sector Lead at HawkinsBrown, and a member of the Ealing Civic Society judging panel.
Across the station, the design and construction team were successful in restoring the historic signs, as well as providing the staircases, timber handrails and cast-iron balustrades a new lease of life. Despite the drive to move back to the Victorian aesthetic, the technology in the building has not followed suit, with new customer information screens around the building to display live travel information. The lighting around the build has been upgraded to brighter, energy-saving LEDs fitted in the traditional hanging lanterns. The old, dilapidated building on Platform 2 is now a new spacious waiting room, with restored period features inside of it, as well as a newly converted accessible toilet facility, and an accessible ticket office window available for use. To honour cohesivity, the waiting room on Platform 3 has also been completely redone to mirror the other.
Upon refurbishment, the station has received the installation of lifts across the premises, allowing step-free access in the whole building. All 41 stations on the Elizabeth line will have step-free access. In 2020 the local council to Hanwell Station pedestrianised the surrounding area directly outside the station in order to create a paved forecourt, only increasing the accessibility of the travel building.
The train station capacity has more than doubled, with at least four modern trains being able to stop at the station every hour, in either direction.
