| Track replacement work will be carried out at Weaste tram stop next month as this year’s programme of continuing improvements to the Metrolink network gets under way. The work – scheduled to take place from Saturday, 1 February until Tuesday, 25 February – means no trams will run between Eccles and MediaCityUK during this time. Trams will continue to operate from Manchester city centre to MediaCityUK as normal. A bus replacement service will run between the affected stops, although passengers may find it faster or cheaper to catch one of the frequent Bee Network buses that call along the route. The work is part of a planned £147m package to maintain, upgrade and improve the Metrolink network up to 2027. Further track works are planned for various city centre locations later this year. Metrolink is UK’s largest light rail network and has 99 stops across 64 miles of track, with more than 780 million journeys having been made since opening in 1992. A key part of the Bee Network, it is now carrying more people than ever before with a record 45.57m trips being made on trams last year. The rolling programme of works – funded from the government’s City Region Sustainable Transport Settlement – will ensure the network keeps on delivering safe, reliable and accessible services for millions more people into the future. Last year, more than £20m was invested in tram improvement works across Greater Manchester, including at Piccadilly Gardens, London Road and Market Street, with all projects delivered on time and on budget. Ian Davies, TfGM’s Interim Network Director for Metrolink, said: “The works at Weaste tram stop are essential to ensure that services on the Eccles line remain safe and reliable for the thousands of journeys people make on it every day. “As always, we are working hard to keep any disruption to an absolute minimum, including the provision of replacement buses for our passengers. “Metrolink is the biggest light rail system in the country, so it’s critically important we keep investing in the network and making sure it remains a safe, reliable and accessible way to get around Greater Manchester well into the future. “While this essential work at Weaste is ongoing, I would encourage people to plan ahead and check our website or the Bee Network app for the latest travel information before setting off.” Further information on the tram service pattern for the works can be found here: https://tfgm.com/tram-improvement-works/eccles-line-works-feb-2025 |
